Parking Lot Paving in Randolph, NJ

Professional Surfaces That Work for Business

Durable asphalt parking lots designed for Morris County weather and built to last decades.

A worker wearing a striped shirt operates a yellow road roller to smooth and compact freshly laid asphalt, creating sharp, clean edges on a road surface. The scene is viewed from above.

Hear from Our Customers

A construction worker operates a yellow steamroller to smooth and compact freshly laid asphalt on a road, with steam rising from the hot pavement.

Commercial Asphalt Paving Services

Parking Lots That Actually Last

Your parking lot handles everything. Customer traffic, delivery trucks, New Jersey winters, summer heat waves. When it’s built right, you stop worrying about cracks, potholes, and water damage.

Quality asphalt paving means fewer repair calls, lower maintenance costs, and a professional appearance that reflects well on your business. Your customers notice smooth surfaces and proper striping. Your insurance company notices reduced slip-and-fall risks.

The difference between good paving and great paving shows up years later. Proper base preparation, quality materials, and correct installation techniques determine whether you’re repaving in five years or twenty.

Randolph Commercial Paving Contractors

We Know Morris County Conditions

We’ve been handling commercial asphalt projects throughout Randolph and Morris County for years. We understand local soil conditions, drainage requirements, and how freeze-thaw cycles affect pavement longevity.

Our team works with property managers, business owners, and facility directors who need reliable contractors. We show up when scheduled, complete projects on time, and stand behind our work.

Every job gets the same attention whether it’s a small retail parking area or a large industrial facility. We’re licensed, insured, and equipped to handle commercial projects of any size.

Aerial view of an empty parking lot with multiple rows of marked parking spaces and dividing lines; a few scattered light poles are visible, and a small patch of grass appears in the corner.

Parking Lot Installation Process

Straightforward Process, Professional Results

First, we assess your existing surface and drainage. Poor base preparation causes most pavement failures, so we identify any underlying issues before starting. You’ll get a detailed estimate covering materials, timeline, and any permit requirements.

Next comes excavation and base preparation. We remove old asphalt if needed, grade for proper drainage, and compact the base material. This foundation work determines how long your new parking lot will last.

Finally, we install the asphalt in lifts, compact it properly, and handle striping once it’s cured. Most commercial projects take 2-5 days depending on size. We coordinate with your schedule to minimize business disruption and ensure you can reopen quickly.

An empty parking lot with freshly painted yellow lines in front of a brick building, with green grass, trees, and several houses in the background under a clear blue sky.

Ready to get started?

Explore More Services

About Platinum Paving

Get a Free Consultation

Asphalt Paving and Resurfacing

Complete Commercial Paving Solutions

Our parking lot paving services include new asphalt installation, resurfacing existing lots, and full reconstruction when needed. We handle everything from initial excavation to final striping and ADA compliance markings.

Each project includes proper drainage solutions designed for Randolph’s climate. Water management prevents the freeze-thaw damage that destroys parking lots in New Jersey. We install catch basins, grade for runoff, and ensure your lot drains properly year-round.

We also coordinate with local authorities for any required permits and inspections. Morris County has specific requirements for commercial paving projects, and we handle the paperwork so you don’t have to navigate municipal offices.

A person in an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility box on a sunny day.
Most commercial parking lot projects in Randolph take 2-5 business days, depending on size and complexity. A typical retail parking area might be completed in 2-3 days, while larger facilities can take up to a week. Weather affects timing since we can’t pave in rain or when temperatures drop below 50 degrees. We schedule projects during optimal weather windows and coordinate with your business hours to minimize disruption. The asphalt needs 24-48 hours before vehicles can use it safely.
Resurfacing means applying a new asphalt layer over your existing parking lot, which works when the base is still solid but the surface is worn. Full replacement involves removing old asphalt, repairing the base, and installing completely new pavement. We recommend resurfacing when you have minor cracking and surface wear but no major drainage issues. Full replacement is necessary when you have significant base failure, poor drainage, or structural problems that resurfacing won’t fix.
Commercial parking lot paving costs vary based on size, site conditions, and whether you need full replacement or resurfacing. Resurfacing typically costs less than full reconstruction since we’re not excavating and replacing the base. Factors affecting price include current pavement condition, drainage requirements, accessibility compliance needs, and site access for our equipment. We provide detailed estimates after evaluating your specific property and requirements. Most commercial projects represent a long-term investment that pays for itself through reduced maintenance costs.
Late spring through early fall offers the best conditions for parking lot paving in Randolph. We need temperatures consistently above 50 degrees and dry weather for optimal results. Summer provides ideal curing conditions, but we avoid extremely hot days when asphalt becomes difficult to work with. Fall paving works well if completed before November. Winter paving isn’t recommended due to temperature and weather constraints. We schedule most commercial projects between April and October, coordinating with your business needs and weather forecasts.
Yes, we ensure all commercial parking lots meet ADA accessibility requirements. This includes proper slope grades, designated accessible parking spaces with correct dimensions, and compliant striping and signage. We’re familiar with federal ADA guidelines and local Morris County requirements for commercial properties. Accessibility compliance isn’t optional for business parking lots, and non-compliance creates liability issues. We handle the technical requirements so your parking lot meets all current standards and passes inspections.
A properly installed commercial parking lot in Randolph typically lasts 15-25 years with regular maintenance. Longevity depends on traffic volume, vehicle types, weather exposure, and maintenance practices. Heavy truck traffic shortens lifespan compared to passenger car use. Regular sealcoating every 3-5 years and prompt crack repair extend pavement life significantly. Morris County’s freeze-thaw cycles are hard on asphalt, but quality installation with proper drainage helps parking lots withstand local weather conditions. Most commercial properties need resurfacing rather than full replacement after 15-20 years.