Parking Lot Paving in Fanwood, NJ

Professional Parking Lots That Last

Durable asphalt surfaces built for your business needs and Fanwood’s demanding weather conditions.

A worker wearing a striped shirt operates a yellow road roller to smooth and compact freshly laid asphalt, creating sharp, clean edges on a road surface. The scene is viewed from above.

Hear from Our Customers

A construction worker operates a yellow steamroller to smooth and compact freshly laid asphalt on a road, with steam rising from the hot pavement.

Commercial Asphalt Paving Services

A Parking Lot Your Business Deserves

Your customers notice your parking lot before they walk through your front door. Cracked pavement, faded lines, and potholes don’t just look unprofessional—they create liability headaches you don’t need.

A properly paved parking lot changes everything. Smooth asphalt that handles heavy traffic without breaking down. Clean striping that guides traffic flow and maximizes parking spaces. Proper drainage that prevents those frustrating puddles and ice patches that keep customers away.

You get peace of mind knowing your property looks professional and operates safely. Your maintenance headaches disappear when you start with quality materials and expert installation that’s built to last through Fanwood’s freeze-thaw cycles and summer heat.

Fanwood Parking Lot Contractors

We’ve been handling commercial parking lot projects throughout central New Jersey for years. We understand what business owners need: reliable contractors who show up when scheduled, complete quality work without disrupting operations, and deliver results that last.

Our team specializes in commercial asphalt paving, which means we have the heavy-duty equipment and experience to handle everything from small office complexes to large retail centers. We’re licensed, insured, and familiar with local requirements in Fanwood and surrounding areas.

You’re not our first parking lot project, and you won’t be our last. We’ve learned what works in this climate and what doesn’t.

Aerial view of an empty parking lot with multiple rows of marked parking spaces and dividing lines; a few scattered light poles are visible, and a small patch of grass appears in the corner.

Parking Lot Installation Process

Straightforward Process, Professional Results

Every parking lot project starts with proper site evaluation and planning. We assess your current pavement condition, drainage needs, and traffic patterns to determine whether you need complete replacement, resurfacing, or targeted repairs.

Next comes preparation—the foundation that determines how long your parking lot will last. We handle excavation, grading, and base installation using commercial-grade materials designed for your specific traffic load. Proper drainage gets built in from the start, not added as an afterthought.

The paving itself happens quickly once preparation is complete. We schedule around your business hours when possible and work efficiently to minimize disruption. Final striping and marking complete the project, giving you clearly defined parking spaces and ADA-compliant accessibility features.

An empty parking lot with freshly painted yellow lines in front of a brick building, with green grass, trees, and several houses in the background under a clear blue sky.

Ready to get started?

Explore More Services

About Platinum Paving

Get a Free Consultation

Complete Parking Lot Services

Everything Your Parking Lot Needs

Our parking lot paving services cover new installation, complete resurfacing, and major repairs. We handle both asphalt and concrete applications, though most commercial properties choose asphalt for its durability and cost-effectiveness.

Every project includes proper base preparation, professional-grade materials, and precise grading for optimal drainage. We also handle line striping, ADA compliance features, and any necessary permits or approvals required in Fanwood.

Whether you’re dealing with a deteriorating parking lot that needs complete replacement or looking to extend the life of existing pavement through resurfacing, we have the equipment and expertise to handle projects of any size. Our goal is delivering a parking lot that serves your business well for years to come.

A person in an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility box on a sunny day.
Most commercial parking lot projects take 2-5 days depending on size and scope. New installation requires more time for excavation and base preparation, while resurfacing existing lots moves faster. Weather conditions can affect timing, particularly for asphalt work which requires dry conditions and appropriate temperatures. We provide realistic timelines during project planning and work to minimize disruption to your business operations. Rush jobs are possible for emergency situations, though proper curing time is always necessary for optimal results.
Resurfacing involves applying new asphalt over existing pavement that’s structurally sound but showing surface wear. It’s cost-effective when the base is solid and drainage is adequate. Complete replacement becomes necessary when the existing pavement has structural failure, poor drainage, or extensive cracking that indicates base problems. We evaluate each situation individually and recommend the most cost-effective approach. Resurfacing typically costs 40-60% less than full replacement but isn’t appropriate for severely damaged lots where underlying issues would cause premature failure.
Asphalt parking lots can typically handle light vehicle traffic within 24-48 hours under normal weather conditions. However, the pavement continues curing and hardening for several weeks. We recommend avoiding heavy trucks or equipment for the first week when possible. Hot weather extends curing time, while cooler temperatures slow the process. We’ll provide specific guidance based on your project timeline and local weather conditions. Emergency access can usually be accommodated sooner if necessary, though we prefer allowing proper curing time for maximum durability.
Yes, we handle all line striping, handicap spaces, and ADA compliance features as part of our complete parking lot services. This includes proper placement and sizing of accessible parking spaces, appropriate signage, and pathway markings. We’re familiar with current ADA requirements and local Fanwood regulations. Striping is typically completed after the asphalt has properly cured, usually within a week of paving. We use high-quality paint designed for durability and visibility. Restriping services are also available for existing lots that need refreshed markings without new pavement.
Several factors influence parking lot paving costs including lot size, current pavement condition, required excavation depth, drainage needs, and accessibility requirements. Material costs fluctuate seasonally, with spring and fall typically offering better pricing than peak summer months. Site accessibility affects equipment mobilization costs. Additional features like concrete curbing, catch basins, or extensive striping add to the total investment. We provide detailed estimates that break down all project components so you understand exactly what you’re paying for and can make informed decisions about optional upgrades.
A properly installed commercial parking lot should last 15-25 years with appropriate maintenance. Lifespan depends on traffic volume, vehicle types, climate exposure, and maintenance practices. Regular seal coating every 3-5 years and prompt crack repair significantly extend pavement life. Heavy truck traffic reduces longevity compared to passenger vehicle use. Fanwood’s freeze-thaw cycles create additional stress, making proper installation and drainage crucial for maximum lifespan. We warranty our workmanship and can recommend maintenance schedules to protect your investment and maximize the return on your paving project.