Parking Lot Paving in East Franklin, NJ

Professional Surfaces That Last Decades

Quality parking lot paving that enhances your property value and eliminates costly repairs.

A worker wearing a striped shirt operates a yellow road roller to smooth and compact freshly laid asphalt, creating sharp, clean edges on a road surface. The scene is viewed from above.

Hear from Our Customers

A construction worker operates a yellow steamroller to smooth and compact freshly laid asphalt on a road, with steam rising from the hot pavement.

Commercial Parking Lot Services

What Quality Paving Actually Gets You

Your parking lot is the first thing customers see when they visit your business. A professionally paved surface creates an immediate impression of quality and attention to detail that reflects directly on your brand.

Beyond appearances, quality parking lot paving eliminates the liability headaches that come with cracked, uneven surfaces. No more worrying about trip hazards or vehicle damage claims. No more emergency patch jobs that eat into your budget every few months.

The right asphalt or concrete installation handles New Jersey’s freeze-thaw cycles without cracking or settling. Proper drainage keeps water from pooling and creating ice hazards in winter. Professional line striping maximizes your parking capacity while ensuring ADA compliance.

East Franklin Paving Contractors

Local Expertise You Can Count On

Platinum Paving has been serving East Franklin and surrounding areas with commercial-grade paving services that stand the test of time. We understand the unique challenges of New Jersey’s climate and soil conditions.

Every project uses materials and techniques specifically chosen for the local environment. We know which asphalt mixes perform best in this region and how to prepare substrates that won’t shift or settle over time.

From small retail parking areas to large commercial complexes, we handle projects of all sizes with the same attention to detail and commitment to quality workmanship.

Aerial view of an empty parking lot with multiple rows of marked parking spaces and dividing lines; a few scattered light poles are visible, and a small patch of grass appears in the corner.

Parking Lot Installation Process

How Professional Paving Actually Works

The process starts with a thorough site evaluation to assess drainage, soil conditions, and traffic patterns. This determines the proper base preparation and material specifications for your specific location and usage requirements.

Excavation and grading come next, creating the proper slope for drainage and a stable foundation. The base layer gets compacted to engineering specifications before any asphalt or concrete is placed. This foundation work determines how long your parking lot will last.

Paving happens in carefully controlled lifts, with each layer compacted while the material is at optimal temperature. Final steps include line striping, signage installation, and a thorough cleanup. Most commercial projects are completed within 3-5 days, depending on size and complexity.

An empty parking lot with freshly painted yellow lines in front of a brick building, with green grass, trees, and several houses in the background under a clear blue sky.

Ready to get started?

Explore More Services

About Platinum Paving

Get a Free Consultation

Asphalt and Concrete Options

What's Included in Every Project

Every parking lot paving project includes complete site preparation, proper base installation, and your choice of asphalt or concrete surfacing. Line striping and basic signage are standard, along with ADA-compliant accessible spaces and pathways.

East Franklin’s clay soils require specific base preparation techniques to prevent settling and cracking. We adjust compaction methods and material choices based on soil test results and expected traffic loads. This attention to local conditions is what separates lasting installations from quick fixes.

Drainage solutions are integrated into every design, preventing the water damage and ice formation that destroy parking lots prematurely. Catch basins, proper grading, and subsurface drainage keep your investment protected year-round.

A person in an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility box on a sunny day.
Most commercial parking lot projects in East Franklin take 3-5 business days from start to finish, depending on size and complexity. Weather conditions can affect the timeline, as asphalt installation requires dry conditions and temperatures above 50 degrees. The process includes excavation, base preparation, paving, and line striping. Larger projects or those requiring extensive drainage work may take longer. You can typically use the parking lot 24-48 hours after paving is complete, though heavy traffic should be avoided for the first week to allow proper curing.
Asphalt costs less upfront and handles freeze-thaw cycles better, making it popular for New Jersey commercial properties. It’s easier to repair and can be resurfaced when needed. Concrete lasts longer and handles heavy loads better, but costs more initially and can crack in extreme temperature changes. For most East Franklin businesses, asphalt provides the best balance of durability and cost-effectiveness. The choice often depends on your budget, expected traffic loads, and long-term maintenance preferences.
Commercial parking lot paving typically ranges from $3-7 per square foot in East Franklin, depending on site conditions, material choice, and project complexity. Asphalt generally costs less than concrete, while extensive excavation or drainage work increases the price. Factors affecting cost include soil conditions, accessibility, thickness requirements, and current material prices. The most accurate pricing comes from an on-site evaluation that considers your specific conditions and requirements. Most contractors provide free estimates for commercial projects.
A properly installed asphalt parking lot should last 15-20 years in East Franklin’s climate with regular maintenance. Concrete can last 25-30 years or more. The lifespan depends heavily on installation quality, drainage, traffic loads, and maintenance practices. Regular sealcoating every 3-5 years and prompt crack repair can extend asphalt life significantly. Poor installation or neglected maintenance can cut the lifespan in half. Signs it’s time for replacement include extensive cracking, drainage problems, and base failure that can’t be addressed with resurfacing.
Yes, professional line striping and ADA-compliant accessible spaces are included with every parking lot installation. This includes proper spacing, signage, and accessible pathways that meet current federal requirements. The number of accessible spaces required depends on your total parking capacity, and these must be located on the shortest accessible route to building entrances. Line striping uses high-quality paint designed for durability and visibility. Most commercial properties also need fire lane markings and directional arrows, which are included in the installation.
Proper drainage design is included in every parking lot installation to prevent water pooling and ice formation. This includes grading, catch basins, and subsurface drainage as needed. If drainage issues develop due to installation problems, we will return to address them at no charge. However, drainage problems are often prevented through proper site evaluation and engineering before work begins. East Franklin’s clay soils require specific drainage solutions, and as experienced local contractors, we understand these requirements. Always discuss drainage concerns during the initial consultation to ensure they’re addressed in the design.