Parking Lot Paving in Drakestown, NJ

Professional Lots That Last Decades

Smooth, durable asphalt that handles New Jersey weather while keeping your business looking sharp.

A worker wearing a striped shirt operates a yellow road roller to smooth and compact freshly laid asphalt, creating sharp, clean edges on a road surface. The scene is viewed from above.

Hear from Our Customers

A construction worker operates a yellow steamroller to smooth and compact freshly laid asphalt on a road, with steam rising from the hot pavement.

Commercial Parking Lot Services

What Your Property Gets

Your customers notice a smooth, professional parking lot before they even walk through your doors. It sets the tone for their entire experience with your business.

A properly installed asphalt parking lot gives you decades of reliable service. No more worrying about potholes creating liability issues or water pooling that turns into ice hazards every winter. No more apologizing to customers for the rough ride across your lot.

You get a surface that drains properly, looks professional year-round, and handles the constant freeze-thaw cycles that destroy poorly installed pavement. Your maintenance headaches disappear, and your property value stays strong.

Drakestown Paving Contractors

We Know Morris County Pavement

We’ve been installing and maintaining commercial parking lots throughout Morris County for years. We understand exactly how New Jersey’s climate affects asphalt and what it takes to build lots that last.

Every project starts with proper base preparation and uses materials specifically chosen for local soil conditions and weather patterns. We know local regulations, drainage requirements, and ADA compliance standards that affect commercial properties in Drakestown.

You’re working with contractors who live and work in the area, not a crew passing through from out of state.

Aerial view of an empty parking lot with multiple rows of marked parking spaces and dividing lines; a few scattered light poles are visible, and a small patch of grass appears in the corner.

Parking Lot Installation Process

How Your Project Actually Happens

Every parking lot project starts with a site evaluation to check drainage, soil conditions, and traffic patterns. This determines the base depth and materials needed for your specific location and usage requirements.

Next comes excavation and base preparation. This is where most contractors cut corners, but it’s the foundation of everything that follows. The base gets properly compacted and graded for drainage before any asphalt goes down.

Asphalt installation happens in lifts, with each layer compacted while hot for maximum density and durability. Final grading ensures proper water flow away from buildings and prevents pooling. Line striping and any required signage complete the project once the surface has properly cured.

An empty parking lot with freshly painted yellow lines in front of a brick building, with green grass, trees, and several houses in the background under a clear blue sky.

Ready to get started?

Explore More Services

About Platinum Paving

Get a Free Consultation

Asphalt Parking Lot Solutions

Complete Commercial Paving Services

We handle everything from new parking lot installation to resurfacing existing lots that have reached the end of their useful life. Our services include full-depth asphalt installation, overlay and resurfacing, concrete parking lot installation, and comprehensive repair work.

We also provide ongoing maintenance services like crack sealing, sealcoating, and pothole repair that extend your pavement’s life and protect your investment. All work includes proper drainage solutions and meets ADA accessibility requirements for commercial properties.

Whether you need a small retail lot or a large industrial facility parking area, every project receives the same attention to base preparation, material quality, and installation standards that ensure long-term performance in Drakestown’s climate.

A person in an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility box on a sunny day.
Most commercial parking lot installations take 3-7 days depending on size and complexity. Weather can extend timelines since asphalt needs dry conditions for proper installation. The process includes excavation and base preparation (typically 1-2 days), asphalt installation (1-2 days), and curing time before full use. Larger projects or those requiring extensive drainage work may take longer. You can usually allow limited traffic after 24 hours, but heavy vehicles should wait 3-5 days for full curing.
Asphalt costs less upfront and handles freeze-thaw cycles better than concrete, making it ideal for New Jersey’s climate. It’s also easier to repair and resurface when needed. Concrete lasts longer overall but costs significantly more initially and can crack during freeze-thaw cycles. For most commercial applications in Drakestown, asphalt provides the best combination of durability, cost-effectiveness, and repairability. Concrete makes sense for heavy-duty applications or when you want a specific aesthetic appearance.
Commercial parking lot paving typically runs $3-7 per square foot for new installation, depending on base requirements, drainage needs, and site conditions. Resurfacing existing lots costs $2-4 per square foot if the base is in good condition. Factors affecting price include excavation depth needed, drainage improvements, accessibility requirements, and current material costs. Every property is different, so accurate pricing requires a site evaluation to assess soil conditions, drainage needs, and traffic requirements specific to your location.
Resurfacing works when your existing base is solid but the surface shows wear, minor cracking, or weathering. If you have widespread potholes, major settling, or drainage problems, full replacement is usually more cost-effective long-term. A good test is whether cracks are surface-level or extend through to the base. Surface cracks can be addressed with resurfacing, but structural issues require starting over. Most well-built asphalt lots need resurfacing every 15-20 years and full replacement every 25-30 years.
Most parking lot projects require permits from Morris County or local authorities, especially if you’re changing drainage patterns, expanding the paved area, or modifying traffic flow. ADA compliance requirements also affect commercial parking lot design and striping. Permit requirements vary based on project scope, property zoning, and environmental considerations. Experienced local contractors handle permit applications and ensure work meets all code requirements. It’s always better to check permit needs upfront rather than face compliance issues later.
Regular maintenance starts with crack sealing every 2-3 years to prevent water infiltration that causes bigger problems. Sealcoating every 3-5 years protects against UV damage and extends surface life. Address any drainage issues immediately since standing water is asphalt’s biggest enemy. Keep the surface clean and remove snow promptly in winter. Avoid using metal plows directly on the surface. Most importantly, fix small problems before they become major repairs. A well-maintained parking lot can last 25-30 years with proper care.