We start with an on-site consultation to assess your specific conditions. Vernon Center properties have unique challenges – from soil composition to drainage patterns – that affect how your driveway should be built.
The real work happens in the preparation phase. We properly excavate to the right depth, install and compact a stone base in lifts, and ensure proper grading for drainage. This foundation work determines whether your driveway lasts 5 years or 20.
Finally, we install your chosen material using proven techniques. For asphalt driveway paving, we use hot mix designed for New Jersey’s temperature swings. For concrete driveway paving, we use air-entrained mixes that resist freeze-thaw damage.
Most residential driveway paving projects take 2-3 days from start to finish, depending on size and site conditions.