Every successful commercial paving project starts with thorough site analysis and foundation building. We measure, mark, and excavate any faulty material before constructing a properly graded, compacted aggregate base.Proper drainage evaluation happens during this phase. New Jersey’s freeze-thaw cycles can quickly destroy poorly drained pavement, so we install proper grading and drainage systems to direct water away from your asphalt surface.Next comes hot mix asphalt application, where heated asphalt is distributed uniformly by paving machines to meet engineered thickness requirements. The final step involves proper compaction using heavy rollers to achieve target density – this is critical for pavement strength, stability, and resistance to water infiltration that causes freeze-thaw damage.