Parking Lot Paving in Neshanic, NJ

Parking Lots That Actually Last

Professional asphalt and concrete parking lot installation that handles New Jersey weather and heavy traffic without constant repairs.

A worker wearing a striped shirt operates a yellow road roller to smooth and compact freshly laid asphalt, creating sharp, clean edges on a road surface. The scene is viewed from above.

Hear from Our Customers

A construction worker operates a yellow steamroller to smooth and compact freshly laid asphalt on a road, with steam rising from the hot pavement.

Commercial Parking Lot Services

No More Customer Complaints About Potholes

Your customers shouldn’t have to dodge craters just to visit your business. A properly paved parking lot eliminates those awkward conversations about damaged rims and scraped bumpers.

You get a smooth, professional surface that makes a good first impression instead of sending people straight to your competitors. No more emergency patch jobs or watching customers shake their heads as they navigate around another pothole.

The right parking lot paving job means years without major repairs, proper drainage that prevents ice buildup, and surfaces that can actually handle delivery trucks without cracking apart.

Neshanic Asphalt Paving Contractors

We Know New Jersey Parking Lots

We’ve been handling commercial parking lot projects throughout central New Jersey for years. We understand how freeze-thaw cycles destroy poorly installed asphalt and why proper base preparation matters more than most contractors want to admit.

Our crew knows the difference between a quick patch job and actual parking lot paving that lasts. We’ve seen what happens when corners get cut, and we’ve built our reputation by doing the work right the first time.

When you’re dealing with customer traffic, delivery schedules, and business operations that can’t stop, you need contractors who show up when they say they will and finish on schedule.

Aerial view of an empty parking lot with multiple rows of marked parking spaces and dividing lines; a few scattered light poles are visible, and a small patch of grass appears in the corner.

Parking Lot Installation Process

Here's How We Handle Your Project

First, we assess your current parking lot condition and drainage issues. If you’re dealing with resurfacing, we determine what can stay and what needs complete removal. For new installation, we evaluate soil conditions and traffic requirements.

Next comes proper base preparation – the part that determines whether your parking lot lasts five years or twenty. We excavate to the right depth, install proper aggregate base, and ensure correct grading for drainage.

The asphalt or concrete installation happens in optimal weather conditions with proper compaction and finishing. We handle line striping, ADA compliance, and any necessary permits. Most commercial projects take 2-4 days depending on size, with minimal disruption to your business operations.

An empty parking lot with freshly painted yellow lines in front of a brick building, with green grass, trees, and several houses in the background under a clear blue sky.

Ready to get started?

Explore More Services

About Platinum Paving

Get a Free Consultation

Complete Parking Lot Solutions

Everything Your Property Needs

Our parking lot paving services cover new asphalt installation, complete resurfacing, and concrete parking lot construction. We handle everything from small business lots to large commercial properties and industrial facilities.

You get proper drainage systems, ADA-compliant accessibility features, and line striping that meets local requirements. We work with property managers who need scheduled maintenance and business owners dealing with emergency repairs.

Each project includes site preparation, base installation, paving or concrete work, and final finishing. We coordinate with your schedule to minimize business disruption and handle any necessary permits or inspections required in Neshanic and surrounding areas.

A person in an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility box on a sunny day.
Most commercial parking lot paving projects take 2-4 days from start to finish, depending on the size and complexity. Small business lots can often be completed in 1-2 days, while larger commercial properties may take a week. Weather plays a role – we won’t install asphalt in rain or when temperatures are too cold. We schedule the work to minimize disruption to your business, often working in sections so you can maintain some parking availability. The new asphalt needs 24-48 hours to cure before heavy traffic, though light vehicles can typically use it within 8-12 hours.
Resurfacing means installing a new layer of asphalt over your existing parking lot, which works when the base is still solid but the surface is cracked or worn. Complete replacement involves removing the old asphalt down to the base layer and starting fresh. If you have major drainage issues, significant settling, or base failure, resurfacing won’t solve the underlying problems. We evaluate your current lot condition and recommend the most cost-effective approach. Resurfacing costs less upfront but won’t last as long if there are structural issues underneath.
Parking lot paving costs typically range from $3-7 per square foot for asphalt, depending on thickness requirements, base preparation needs, and site conditions. Concrete parking lots cost more, usually $6-12 per square foot. Factors that affect pricing include excavation requirements, drainage work, accessibility features, and the complexity of the layout. Simple resurfacing costs less than complete installation. We provide detailed estimates after evaluating your specific site conditions, traffic requirements, and any special features like handicap accessibility or heavy-duty areas for delivery trucks.
Yes, we can usually work in phases to keep part of your parking lot available during construction. We coordinate with your business schedule and peak hours to minimize customer impact. For smaller lots, we might recommend scheduling the work over a weekend or during your slowest business period. Larger commercial properties can often be done in sections, allowing you to maintain some parking spaces throughout the project. We discuss your specific needs during the planning phase and create a schedule that works for your business operations and customer access requirements.
A properly installed asphalt parking lot should last 15-25 years with regular maintenance, while concrete can last 25-30 years or more. The lifespan depends heavily on traffic volume, weather exposure, and maintenance practices. Regular sealcoating every 3-5 years and prompt crack repair can significantly extend the life of asphalt. Heavy traffic areas like loading zones may need attention sooner than general parking areas. Poor installation or inadequate base preparation can reduce lifespan dramatically, which is why proper construction techniques matter more than just using quality materials.
Yes, we ensure all parking lot projects meet ADA accessibility requirements, including proper handicap space dimensions, access aisles, and pathway slopes. We handle the line striping for parking spaces, fire lanes, crosswalks, and directional arrows. Our crew knows the current regulations for handicap space ratios, signage placement, and surface requirements. We can also add features like speed bumps, wheel stops, or bollards as needed. All line striping uses durable paint designed for high-traffic areas and New Jersey weather conditions. We coordinate any required inspections to ensure your parking lot meets all local and federal accessibility standards.